Method · Bid strategy

Go / No-go on a tender: the method for deciding whether it's worth bidding in 2026

📅 October 2026 ⏱ 8 min read 🏛 CezanneAO

The best bidders don't bid for everything: they choose. A 30% success rate on 10 targeted tenders brings in as much as 10% on 30 attempts, with three times less effort. The go/no-go decision may be the most underrated skill in public procurement.

A tender takes time: 15 hours for a simple application, 60 to 80 hours for a full technical proposal on a complex contract. For a team of 3 bidding for 2 tenders a month, that's 300 to 500 hours a year spent on bids. Every hour spent on a lost bid is an hour less for winnable projects.

The 6-criterion decision grid

Score each contract on the following 6 criteria, from 1 to 5. A total below 18 is generally a no-go; between 18 and 24, it is up for discussion; above 24, it's a go.

1. Technical fit
Do our skills really cover the commission?
/ 5
2. Similar references
Do we have directly comparable references?
/ 5
3. Knowledge of the client
Have we worked with them before, or do we know them?
/ 5
4. Team availability
Can we mobilise the right people if we win?
/ 5
5. Economic conditions
Is the contract profitable on the proposed terms?
/ 5
6. Estimated bid effort
Is the writing effort proportionate to the chances? (reverse score)
/ 5
✅

GO — Score ≥ 24/30

Put your best people on this bid. It's a contract where you have a real chance and the investment is justified. Aim for excellence in the technical proposal.

⚖️

TO DISCUSS — Score 18 to 23/30

Look at the weakest criterion. If you can close the gap (find a partner, free up time, adapt your offer), it may be a go. If not, pass.

🚫

NO-GO — Score < 18/30

Don't bid, unless the contract is a rare strategic opportunity (a first foothold with a client you have long targeted, a high-profile contract). Even then, limit the time you invest.

Immediate red flags (automatic no-go)

Some signals in the tender documents justify an immediate no-go, without even calculating your score:

🚩

Abnormally short submission deadline: 7 days for a complex contract. A sign either of a contract already informally awarded or of an inexperienced buyer. Either way, a bad start.

🚩

Tailor-made selection criteria: if the specifications name very specific tools, methods or certifications that only one provider has, the contract is probably biased.

🚩

Clearly insufficient budget: if the estimated value is too low to cover a serious service, submitting a compliant bid forces you either to underpay your team or to deliver rushed work.

🚩

Disproportionate guarantee requirements: turnover or insurance requirements clearly excessive for the subject of the contract signal a risky file.

Positive signals (in favour of a go)

✅

You have worked with this client before: your track record with them is your best argument. A satisfied buyer often comes back to the same provider if the offer is competitive.

✅

The specifications match your core business exactly: you have already delivered exactly this type of commission, with recent, verifiable references.

✅

Few competitors expected: technical contracts, geographically constrained ones or those requiring rare accreditations naturally attract less competition.

✅

An open tender following a framework agreement you hold: your existing position gives you an advantage in understanding the need and the context.

CezanneAO helps you prioritise your tenders

Tracking dashboard, relevance scoring, custom alerts: CezanneAO helps you focus your energy on the contracts where you have the best chances.

See the demo

Frequently asked questions

Yes, but with clear eyes. A "presence" application makes sense if it costs little time (simple application, no heavy technical proposal), if the client is strategic for your growth, and if you limit the time invested to 10–15 hours at most. Send a clean, professional file even if you don't expect to win: juries remember well-prepared bids, and it can open doors for future contracts.
It is hard to know exactly how many firms will bid, but you can estimate: contracts published in national journals or on TED attract 5 to 15 bidders on average, depending on the niche. Local or highly technical contracts attract fewer. When you lose a contract, ask the buyer for the award information (in France, the "rapport de présentation"): it usually shows the number of bids received, which gives you a benchmark for similar future contracts.
Both have their place. Below-threshold procedures (MAPA in France) often have shorter deadlines, lighter files and fewer competitors. They are particularly well suited to small firms. Formal procedures above the European thresholds (open procedure, competitive dialogue) involve larger contracts but require more resources. The go/no-go decision applies to every type of procedure.

Found this article useful? Share it: